Back Back

Water Main Design: Malcolm Randall Veterans Affairs Medical Center Gainesville, Florida

July 9th, 2015 | Case Studies - Healthcare | Share
Photo of a water main

Replace Existing Transite Water Main Loop

Paradigm recently designed a new transite water main around the Malcolm Randall VAMC campus. This project upsized an existing water main in some sections and replaced older sections of main in other sections of campus.

The project brought the new water main to the buildings on campus, where they then connected to the service lines which went into the buildings.

Backflow preventers were installed on this project. Also, this new landscaping, pavement repair and sidewalk repair was included as part of this design.