Back Back

Posts Tagged ‘hemodialysis’

Third Floor Clinic Renovation: VA Medical Center, San Diego, CA

May 6th, 2019 | Case Studies - Healthcare | Share

Water Leak Damage Remediation West Wing, Third Floor Client: VA Medical Center, San Diego, California Paradigm is providing design and construction period services for this San Diego VAMC West Wing project, a 19,630 square foot renovation on the third floor.…

Read More