Water Leak Damage Remediation West Wing, Third Floor

Client: VA Medical Center, San Diego, California

Paradigm is providing design and construction period services for this San Diego VAMC West Wing project, a 19,630 square foot renovation on the third floor. This includes the Hemodialysis Clinic and two Specialty Clinics, the Access Clinic and Women’s Clinic.

This project includes the demolition of drywall, ceilings, flooring, walls, asbestos fireproofing, and ductwork that has suffered water damage from a recent construction accident. The demolition will be conducted under mold and asbestos remediation conditions, and the areas and equipment demolished will be replaced or reconstructed.

The project scope includes:

  • Hemodialysis Clinic
    • 20 hemodialysis stations with patient support spaces
    • Nurse’s stations
    • Staff support spaces
    • Equipment and process spaces
    • Reception space
  • Access Clinic
    • Patient transition space
    • 22 exam/consultation rooms
    • 1 procedure room
    • 24 work stations
    • 4 offices
    • 1 conference room
    • 1 Teamlet workroom
    • 1 EKG suite
    • Clinic support spaces
    • Staff lounge
  • Women’s Clinic
    • 2 procedure rooms
    • Chart room with 3 work stations
    • Consultation room
    • Waiting
    • Dirty linen
    • New IT room with 4 computer racks