Back Back

Posts Tagged ‘clinic’

San Diego VA Medical Center Renovations

May 28th, 2019 | Blog | Share

Paradigm is currently working with the VA San Diego Healthcare System on major renovations of the Medical Center’s west wing. This includes demolition and reconstruction on the Center’s third and fourth floors. As part of this renovation, Paradigm designed a…

Read More

Fourth Floor Clinic Renovation: VA Medical Center, San Diego, CA

May 23rd, 2019 | Case Studies - Healthcare | Share

Water Leak Damage Remediation West Wing, Fourth Floor Client: VA Medical Center, San Diego, California Paradigm is providing design and construction contract documents for this project, the renovation of approximately 5,100 SF on the fourth floor of the West Wing.…

Read More

Third Floor Clinic Renovation: VA Medical Center, San Diego, CA

May 6th, 2019 | Case Studies - Healthcare | Share

Water Leak Damage Remediation West Wing, Third Floor Client: VA Medical Center, San Diego, California Paradigm is providing design and construction period services for this San Diego VAMC West Wing project, a 19,630 square foot renovation on the third floor.…

Read More

Clinic Renovation: VA Medical Center, Dayton, OH

May 7th, 2019 | Case Studies - Healthcare | Share

Improve Sub-Specialty Waiting Area Client: VA Medical Center, Dayton, Ohio Paradigm is providing design services for an approximately 4,600 square foot renovation in this extremely busy Primary Care Sub-Specialty Clinic. The current layout of this Dayton VAMC waiting area is…

Read More