Back Back

Author Archive

Endoscopy Renovation: VA Illiana Health Care System, Danville, IL

April 29th, 2019 | Case Studies - Healthcare | Share

Renovate Endoscopy Suite Client: VA Illiana Health Care System, Danville, Illinois Paradigm provided complete design and construction period services for this Danville VAMC Endoscopy project. It involved the complete renovation of the fifth-floor west wing of Building 58, converting a former ICU suite…

Read More

Cardiology Renovation: Tennessee Valley Healthcare System, Nashville, TN

April 29th, 2019 | Case Studies - Healthcare | Share

Cardiology Improvements Client: Tennessee Valley Healthcare System Paradigm provided complete design services for the partial renovation of the 9,000 SF Nashville VAMC Cardiology Center to improve the functionality, flow, and environment of care. The main focus of the project was to increase, reconfigure,…

Read More

Simulation Lab Renovation: John D. Dingall VA Medical Center, Detroit, MI

April 30th, 2019 | Case Studies - Healthcare | Share

Installation of Simulation Lab for Education Client: John D. Dingall VA Medical Center, Detroit, Michigan Paradigm’s goal with this Detroit VAMC Simulation Lab design was to provide a new simulation lab and other spaces for the nursing education department. This 3,280…

Read More

Lab Renovation: VA Medical Center, West Haven, CT

May 3rd, 2019 | Case Studies - Healthcare | Share

Install Magnetoencephalography (MEG) Lab Client: VA Medical Center, West Haven, Connecticut Paradigm is providing complete design services for this West Haven VAMC MEG Lab project, a 1,100 SF partial renovation of the existing one-story addition to Building 1, “PET Scan…

Read More

Radiology Renovation: Michael J. Crescenz VA Medical Center, Philadelphia, PA

May 8th, 2019 | Case Studies - Healthcare | Share

Site Preparation for Radiology Rooms Client: Michael J. Crescenz VA Medical Center, Philadelphia, Pennsylvania Paradigm is providing complete design and construction documents for this project, the renovation of Radiographic/Fluoroscope Rooms 3A195, 3A201, 3A203, and 3A214, including all associated control rooms and…

Read More

New Elevators: VA Palo Alto Health Care System, Palo Alto, CA

May 8th, 2019 | Case Studies - Healthcare | Share

Design B100 Offstage Elevator System Client: VA Palo Alto Health Care System, Palo Alto, CA Paradigm is providing complete design and construction documents, as well as construction administration services, for two new offstage patient elevators and lobbies in Building 100,…

Read More