Back Back

Author Archive

Third Floor Clinic Renovation: VA Medical Center, San Diego, CA

May 6th, 2019 | Case Studies - Healthcare | Share

Water Leak Damage Remediation West Wing, Third Floor Client: VA Medical Center, San Diego, California Paradigm is providing design and construction period services for this San Diego VAMC West Wing project, a 19,630 square foot renovation on the third floor.…

Read More

ED Renovation: VA Medical Center, West Palm Beach, FL

May 3rd, 2019 | Case Studies - Healthcare | Share

Renovate Emergency Department Client: VA Medical Center, West Palm Beach, Florida Paradigm designed and renovated an approximately 15,000 SF area of the existing West Palm Beach VAMC Emergency Department, creating an ambulatory/emergency center in an east location of the medical…

Read More

ICU Renovation: VA Central Iowa Health Care System

May 6th, 2019 | Case Studies - Healthcare | Share

Remodel ICU/Telemetry for Patient Privacy Client: VA┬áCentral Iowa Health Care System, Des Moines, Iowa This project includes design services for: Remodel of entire fifth floor in building 1W for Intensive Care Unit space: this 9,723 SF space will have nine…

Read More

West Haven VAMC MEG Lab Installation

April 30th, 2019 | Blog | Share

For the Magnetoencephalography (MEG) Lab Installation at the West Haven VA Medical Center in Connecticut, Paradigm is currently providing complete design services, including architectural, electrical, plumbing, and HVAC. This VA Medical Center is one of two VA hospitals in New…

Read More

New CLC Design: Atlanta VA Medical Center, Decatur, Georgia

April 30th, 2019 | Case Studies - Healthcare | Share

New Community Living Center Design Paradigm is currently providing architectural, structural, mechanical, plumbing, and electrical engineering services for the design of an approximately 23,500 square foot vertical expansion to the existing Atlanta VAMC CLC. Paradigm is incorporating holistic healing concepts…

Read More

OT & KT Renovation: VA Medical Center, Dayton, OH

April 30th, 2019 | Case Studies - Healthcare | Share

Renovate Occupational Therapy & Kinesiotherapy Design Client: Dayton VA Medical Center, Dayton, Ohio Paradigm is providing design services for this 3,300 SF Dayton VAMC renovation. The project consists of an approximately 1,800 SF Occupational Therapy (OT) area and an approximately…

Read More