Structural Support Analysis for Rooftop Air Handling Units Client: University of Kentucky, Lexington, Kentucky Paradigm provided Structural Engineering services – specifically structural support analysis – to determine the structural load of the Life Sciences Building (part of the Medical School/Hospital…
Back
Case Studies
New Facility Construction: United Graphics, Louisville, KY
Paradigm provided architectural, electrical and structural engineering design, equipment layout streamlining, and cost estimation for the renovation and occupancy of a new 50,000 square foot concrete and steel facility. The highlight of this project was the design for a build-out…
Design-Build New Retail Facility: Tindall Property Development, Radcliff, KY
New Retail Facility Client: Tindall Property Development, Radcliff, Kentucky Paradigm provided design-build services for a $1 million, 10,000 square foot, two-story retail facility. The project consisted of four tenants on the top floor and three tenants on the bottom floor, one…
Facility Renovation: Great Northern Manufacturing, Louisville, Kentucky
Office Build-out Client: Great Northern Manufacturing, Louisville, Kentucky Paradigm provided design/build services for the occupancy of a 106,000 square foot concrete facility. Aside from providing all A/E services, the project management scope included moving the client’s complete manufacturing operations from the…
Threat Assessment: Headquarters, 100th Division, US Army Reserve Louisville, Kentucky
Threat Assessment, Vulnerability Assessment, Risk Assessment Mitigation Design Conducted terrorism threat assessment of a government facility not on a government installation Mission Essential Vulnerability Assessment (MEVA) Risk assessment for 2-Star Command Key vulnerabilities were assessed and recommended for: Perimeter standoff…
Chemical Storage Room Renovation: Tinker Air Force Base, OK
Design/Repair Chemical Storage Room in B3113 Client: Tinker Air Force Base, Oklahoma City, Oklahoma Paradigm created code compliant design and construction documents for the repair/ renovation of an existing facility, a portion of Building 9001, into a Chemical Storage Area. The…